YKE supplied a Saudi industrial park EPC contractor with a medium-voltage switchgear and dry-type transformer package tailored for harsh high-temperature and dusty conditions.
The package was completed within a 38-day lead time and passed full SGS inspection before shipment.
Sauvegarder une capture d’écran du projet
- Country
- Saudi Arabia
- Client Type
- EPC contractor
- Application
- Industrial park medium-voltage distribution
- Project Capacity
- Industrial park distribution package
- Standards
- IEC aligned with Saudi project review requirements
- Résultat de la livraison
- 38-day lead time and successful SGS full-item inspection before shipment
- Region
- Middle East
- Related Product Lines
- MV Switchgear, Transformers
Contexte et exigences du projet
- EPC contractor
- Industrial park medium-voltage distribution
- Industrial park distribution package
- Buyer reference details available after NDA
Portée de l'approvisionnement et paramètres clés
- 32 units of KYN28-12 medium-voltage switchgear and 8 units of SCB11 dry-type transformers
- 12kV switchgear package 32 panels + 8 transformers 38-day delivery window
Normes de technologie
- IP65+ dust protection and ambient temperature >=50°C under SASO-oriented project requirements
- IEC aligned with Saudi project review requirements
Résultat de la livraison
- 38-day lead time and successful SGS full-item inspection before shipment
- Buyer reference details available after NDA