Saudi Arabia Industrial Park Power Distribution Project

MV switchgear case fallback image

YKE supplied a Saudi industrial park EPC contractor with a medium-voltage switchgear and dry-type transformer package tailored for harsh high-temperature and dusty conditions.

The package was completed within a 38-day lead time and passed full SGS inspection before shipment.

Project Snapshot

Country
Saudi Arabia
Client Type
EPC contractor
Application
Industrial park medium-voltage distribution
Project Capacity
Industrial park distribution package
Standards
IEC aligned with Saudi project review requirements
Delivery Result
38-day lead time and successful SGS full-item inspection before shipment
Region
Middle East
Related Product Lines
MV Switchgear, Transformers

Project Background & Requirements

  • EPC contractor
  • Industrial park medium-voltage distribution
  • Industrial park distribution package
  • Buyer reference details available after NDA

Supply Scope & Key Parameters

  • 32 units of KYN28-12 medium-voltage switchgear and 8 units of SCB11 dry-type transformers
  • 12kV switchgear package 32 panels + 8 transformers 38-day delivery window

Key Technology & Standards

  • IP65+ dust protection and ambient temperature >=50°C under SASO-oriented project requirements
  • IEC aligned with Saudi project review requirements

Delivery Result

  • 38-day lead time and successful SGS full-item inspection before shipment
  • Buyer reference details available after NDA

Request a similar solution

Tell us your target market and requirements, YKE will respond with a feasible solution.

Next Step

Submit your project requirements for a tailored solution and quote

Share your target market, product line, voltage level, quantity, and delivery timeline – YKE will respond with a preliminary proposal within 24 hours.